Licence to alter
It is often necessary for leaseholders to alter premises they occupy, either before they first move in, or because of a need to refurbish the premises or change their operations.
Depending on the conditions of the lease and the nature of the alterations it is likely that a licence to alter will be required from the landlord giving the leaseholder permission to carry out the alterations.
Typically, works that require a licence might include altering; the structure, building services, internal walls or doors, external windows and so on. Minor changes that might be permitted without the permission of the landlord could include; putting up shelves, redecorating, laying new carpets, and so on. Alterations to leasehold premises are a common cause of dispute, and if there is any doubt about whether works require a licence to alter, the landlord should be consulted. Failure to obtain permission could constitute a serious breach of the lease.
Obtaining permission can be time consuming, particularly if it coincides with agreeing the lease itself, and this can present the leaseholder with the difficulty of having to appointing designers and even contractors at risk to carry out works that might not in the end be permitted. It is important therefore that the landlord should be consulted as soon as possible to determine; whether a licence is necessary, the likelihood of permission being granted, the timescale for obtaining a licence and the form of application required.
An application for a licence to alter might include:
- A description of the works.
- The programme for the works.
- Drawings showing the existing and proposed layout.
- Structural drawings and calculations.
- Building services drawings.
- Specifications.
- Risk assessments and method statements.
- A copy of the F10 notification.
- Evidence of insurances. NB Insurance of the works can be expensive to obtain relative to the value of the works because of the risk to other parts of the premises, and can sometimes be dealt with by adding the leaseholder and contractor to the landlord's insurance.
- Evidence of necessary planning permission, buildings regulations permission and other statutory approvals.
- Evidence of compliance with the Party Wall Act.
The Landlord and Tenant Acts require that permission is not unreasonably withheld, and in some situations, alterations which are necessary to comply with statutory requirements, cannot be withheld.
The licence itself records the agreed changes and the conditions under which those changes must be carried out:
- The agreed works.
- The conditions for the works (such as working hours, noise nuisance, cleanliness and waste handling).
- Requirement to comply with statutory obligations.
- Insurance requirements.
- Allocation of costs. Costs incurred by the landlord in having proposals assessed and preparing the licence to alter may be chargeable to the leaseholder as may additional insurance premiums and work that the landlord wishes to carry out themselves, for example work to security and alarm systems.
- The provision of as-built drawings and specifications.
- Requirement to reinstate the works at the end of the lease (see dilapidations for more information).
The timing of works associated with a licence to alter can be complicated, particularly when they are associated with the initial move into the premises, and a need to synchronise this with:
- The agreement of the lease.
- Relocation and removals.
- Purchase of new equipment, furniture, fixtures and fittings.
- Reinstatement works to the premises that are being vacated.
- Termination of the lease for the premises that are being vacated.
Failure to synchronise these activities can result in significant additional costs, or the need for temporary accommodation.
The landlord may wish to inspect the works at commencement, during the construction period and on completion.
[edit] Related articles on Designing Buildings
- Agent of change.
- Betterment.
- Building an extension.
- Commonhold
- Conversion.
- Dilapidations protocol.
- Dilapidations.
- F10 notification.
- Freehold.
- How to build a porch.
- Land law.
- Lease Negotiations - Tenants Checklist.
- Leasehold.
- Licence for Alterations for Apartment.
- Property disrepair and landlord liabilities.
- Quantified demand.
- Renovation.
- Rent-free period.
- Repairs and optional improvements.
- Restoration.
- Reversion.
- Sample retail lease.
- Schedule of dilapidations.
- Scott schedule.
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.